{"id":22594,"date":"2026-08-15T15:37:05","date_gmt":"2026-08-15T13:37:05","guid":{"rendered":"https:\/\/innovativasmartsolutions.com\/?p=22594"},"modified":"2026-08-25T17:39:49","modified_gmt":"2026-08-25T15:39:49","slug":"belqas-waste-recycling-plant","status":"publish","type":"post","link":"https:\/\/innovativasmartsolutions.com\/fr\/belqas-waste-recycling-plant\/","title":{"rendered":"Belqas Waste Recycling Plant"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Inside the Belqas Municipal Waste Recycling Project<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Work is progressing at the Belqas Waste Recycling Plant in Dakahlia Governorate, alongside ongoing activities at the Kafr El Sheikh site.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Belqas project forms part of the Kitchener Drain water quality improvement program and is being implemented within projects involving the European Bank for Reconstruction and Development,under the supervision of <a href=\"https:\/\/www.mld.gov.eg\/ar\" data-type=\"link\" data-id=\"https:\/\/www.mld.gov.eg\/ar\" target=\"_blank\" rel=\"noopener\">Egypt\u2019s Ministry of Local Development and Ministry of Environment<\/a>.<\/p>\n\n\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/WhatsApp-Image-2026-07-14-at-6.16.11-PM-1-1024x768.jpeg\" alt=\"Mechanical sorting equipment installation at the Belqas waste recycling plant\" class=\"wp-image-22597\" srcset=\"https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/WhatsApp-Image-2026-07-14-at-6.16.11-PM-1-1024x768.jpeg 1024w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/WhatsApp-Image-2026-07-14-at-6.16.11-PM-1-300x225.jpeg 300w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/WhatsApp-Image-2026-07-14-at-6.16.11-PM-1-768x576.jpeg 768w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/WhatsApp-Image-2026-07-14-at-6.16.11-PM-1-16x12.jpeg 16w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/WhatsApp-Image-2026-07-14-at-6.16.11-PM-1-1536x1152.jpeg 1536w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/WhatsApp-Image-2026-07-14-at-6.16.11-PM-1.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Mechanical sorting equipment during installation at the Belqas waste recycling facility<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">A 600 Ton Per Day Waste Processing Facility<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The Belqas plant is being developed on an area of approximately 18 acres, with a design capacity of up to 600 tons of municipal solid waste per day.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Handling this volume requires an integrated treatment line where different stages of the process work together, from receiving mixed municipal waste to sorting, biological treatment, and recovery of materials with further value.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project follows the same direction as other waste management facilities supported by Innovativa Smart Solutions, including the Kafr El Sheikh waste recycling plant.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/\u0646\u0642\u0644-\u0627\u0644\u0634\u0627\u0646-\u0643\u0648\u0646\u0641\u064a\u0631-\u0628\u062a\u0627\u0639-\u0627\u0644\u062a\u0631\u0648\u0645\u0644-1024x768.jpeg\" alt=\"Waste treatment equipment under installation at the Belqas MBT facility\" class=\"wp-image-22598\" srcset=\"https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/\u0646\u0642\u0644-\u0627\u0644\u0634\u0627\u0646-\u0643\u0648\u0646\u0641\u064a\u0631-\u0628\u062a\u0627\u0639-\u0627\u0644\u062a\u0631\u0648\u0645\u0644-1024x768.jpeg 1024w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/\u0646\u0642\u0644-\u0627\u0644\u0634\u0627\u0646-\u0643\u0648\u0646\u0641\u064a\u0631-\u0628\u062a\u0627\u0639-\u0627\u0644\u062a\u0631\u0648\u0645\u0644-300x225.jpeg 300w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/\u0646\u0642\u0644-\u0627\u0644\u0634\u0627\u0646-\u0643\u0648\u0646\u0641\u064a\u0631-\u0628\u062a\u0627\u0639-\u0627\u0644\u062a\u0631\u0648\u0645\u0644-768x576.jpeg 768w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/\u0646\u0642\u0644-\u0627\u0644\u0634\u0627\u0646-\u0643\u0648\u0646\u0641\u064a\u0631-\u0628\u062a\u0627\u0639-\u0627\u0644\u062a\u0631\u0648\u0645\u0644-1536x1152.jpeg 1536w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/\u0646\u0642\u0644-\u0627\u0644\u0634\u0627\u0646-\u0643\u0648\u0646\u0641\u064a\u0631-\u0628\u062a\u0627\u0639-\u0627\u0644\u062a\u0631\u0648\u0645\u0644-16x12.jpeg 16w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/\u0646\u0642\u0644-\u0627\u0644\u0634\u0627\u0646-\u0643\u0648\u0646\u0641\u064a\u0631-\u0628\u062a\u0627\u0639-\u0627\u0644\u062a\u0631\u0648\u0645\u0644.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Waste treatment equipment being installed as part of the Belqas MBT processing system<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Mechanical Biological Treatment at the Core of the Plant<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The Belqas Waste Recycling Plant relies on Mechanical Biological Treatment, MBT, to process mixed municipal solid waste through a combination of mechanical separation and biological treatment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The mechanical section separates different fractions of the incoming waste stream and recovers recyclable materials.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The organic fraction then moves through biological treatment processes designed to improve its potential for further use.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This integrated approach helps extract more value from municipal waste before the remaining residues are directed to final disposal.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/2026-07-16-at-3.30.30-PM-1024x768.jpeg\" alt=\"Belqas waste recycling plant installation works under the Kitchener Project\" class=\"wp-image-22599\" srcset=\"https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/2026-07-16-at-3.30.30-PM-1024x768.jpeg 1024w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/2026-07-16-at-3.30.30-PM-300x225.jpeg 300w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/2026-07-16-at-3.30.30-PM-768x576.jpeg 768w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/2026-07-16-at-3.30.30-PM-16x12.jpeg 16w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/2026-07-16-at-3.30.30-PM.jpeg 1288w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Installation activities at the Belqas waste recycling plant within the Kitchener Project<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Recovering Value from Municipal Solid Waste<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The objective of the processing line is not limited to separating waste into different fractions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The system is designed to identify materials that still have economic or industrial value and direct them toward suitable recovery routes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Recyclable materials are separated for further recycling.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Suitable combustible fractions are prepared for the production of Refuse-Derived Fuel, RDF.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Organic fractions are processed biologically to support further resource utilization.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Together, these processes reduce the amount of residual waste requiring sanitary landfill disposal and improve overall resource recovery from the incoming waste stream.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/WhatsApp-Image-2026-07-20-at-11.39.11-AM-1024x768.jpeg\" alt=\"Mechanical sorting equipment installation at the Belqas waste recycling plant\" class=\"wp-image-22600\" srcset=\"https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/WhatsApp-Image-2026-07-20-at-11.39.11-AM-1024x768.jpeg 1024w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/WhatsApp-Image-2026-07-20-at-11.39.11-AM-300x225.jpeg 300w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/WhatsApp-Image-2026-07-20-at-11.39.11-AM-768x576.jpeg 768w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/WhatsApp-Image-2026-07-20-at-11.39.11-AM-1536x1152.jpeg 1536w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/WhatsApp-Image-2026-07-20-at-11.39.11-AM-16x12.jpeg 16w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/WhatsApp-Image-2026-07-20-at-11.39.11-AM.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Mechanical sorting equipment during installation at the Belqas waste recycling facility<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Technology and Equipment from International Partners<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The technologies and equipment used within the project are supplied by international companies represented by Innovativa Smart Solutions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The plant combines mechanical sorting systems, waste treatment equipment, and technologies selected for large-scale municipal solid waste processing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The role of each system forms part of a wider treatment sequence, where waste moves through several processing stages rather than relying on a single separation step.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/WhatsApp-Image-2026-07-19-at-6.18.39-PM-1024x768.jpeg\" alt=\"Conveyor systems being installed at the Belqas municipal waste treatment facility\" class=\"wp-image-22601\" srcset=\"https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/WhatsApp-Image-2026-07-19-at-6.18.39-PM-1024x768.jpeg 1024w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/WhatsApp-Image-2026-07-19-at-6.18.39-PM-300x225.jpeg 300w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/WhatsApp-Image-2026-07-19-at-6.18.39-PM-768x576.jpeg 768w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/WhatsApp-Image-2026-07-19-at-6.18.39-PM-1536x1152.jpeg 1536w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/WhatsApp-Image-2026-07-19-at-6.18.39-PM-16x12.jpeg 16w, https:\/\/innovativasmartsolutions.com\/wp-content\/uploads\/2026\/08\/WhatsApp-Image-2026-07-19-at-6.18.39-PM.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Conveyor systems connecting different processing stages inside the Belqas waste treatment plant<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Innovativa Smart Solutions on Site<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The Belqas project reflects Innovativa Smart Solutions\u2019 work in supplying technologies and solutions for real waste management facilities under implementation in Egypt.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Our involvement focuses on technologies used across waste sorting, treatment, recycling, RDF production, and resource recovery.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Through projects such as Belqas and Kafr El Sheikh, Innovativa Smart Solutions continues to support the development of integrated waste management infrastructure and practical circular economy applications in Egypt.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-9-16 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe title=\"\u0645\u0635\u0646\u0639 \u0625\u0639\u0627\u062f\u0629 \u062a\u062f\u0648\u064a\u0631 \u0627\u0644\u0645\u062e\u0644\u0641\u0627\u062a \u0627\u0644\u0635\u0644\u0628\u0629 \u0641\u064a \u0645\u0635\u0631 | \u0623\u0639\u0645\u0627\u0644 \u0627\u0644\u062a\u0631\u0643\u064a\u0628 \u0641\u064a \u0628\u0644\u0642\u0627\u0633\" width=\"443\" height=\"788\" src=\"https:\/\/www.youtube.com\/embed\/Xyd_GtML8CU?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>","protected":false},"excerpt":{"rendered":"<p>Inside the Belqas Municipal Waste Recycling Project Work is progressing at the Belqas Waste Recycling Plant in Dakahlia Governorate, alongside ongoing activities at the Kafr El Sheikh site. The Belqas project forms part of the Kitchener Drain water quality improvement program and is being implemented within projects involving the European Bank for Reconstruction and Development,under [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":22595,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,65],"tags":[69,76,77,70,75,72,66,73,74],"class_list":["post-22594","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blogs","category-company-projects","tag-circular-economy","tag-environmental-solutions","tag-mbt","tag-recycling-projects","tag-resource-recovery","tag-sustainable-waste-management","tag-waste-management-projects","tag-waste-recycling","tag-waste-treatment"],"_links":{"self":[{"href":"https:\/\/innovativasmartsolutions.com\/fr\/wp-json\/wp\/v2\/posts\/22594","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/innovativasmartsolutions.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/innovativasmartsolutions.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/innovativasmartsolutions.com\/fr\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/innovativasmartsolutions.com\/fr\/wp-json\/wp\/v2\/comments?post=22594"}],"version-history":[{"count":5,"href":"https:\/\/innovativasmartsolutions.com\/fr\/wp-json\/wp\/v2\/posts\/22594\/revisions"}],"predecessor-version":[{"id":22608,"href":"https:\/\/innovativasmartsolutions.com\/fr\/wp-json\/wp\/v2\/posts\/22594\/revisions\/22608"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/innovativasmartsolutions.com\/fr\/wp-json\/wp\/v2\/media\/22595"}],"wp:attachment":[{"href":"https:\/\/innovativasmartsolutions.com\/fr\/wp-json\/wp\/v2\/media?parent=22594"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/innovativasmartsolutions.com\/fr\/wp-json\/wp\/v2\/categories?post=22594"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/innovativasmartsolutions.com\/fr\/wp-json\/wp\/v2\/tags?post=22594"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}